Learn what to include on your door schedule and

Are you building or renovating a property? If so, then you’ll need to spend time creating a door schedule. A door schedule is an important element of any building or renovation project. It ensures that you get the correct doors and that the process runs as smoothly as possible, saving you time and money in the long run. But what is a door schedule, and what should you include?

What Is a Door Schedule?

A door schedule is a list of all the doors, door frames, and door accessories that are to be installed in your building. It should include specific details like the type of door and door hardware, the door size and its location, and any special requirements (such as security doors or fire-rated doors). When you consider what goes into creating a door schedule, it makes sense why it’s such a vital part of any building or renovation project.

Why Do You Need a Door Schedule?

Using a door schedule ensures that you get the right type of door in the right frame and that the process is as efficient and cost-effective as possible. It also guarantees that all the doors fit properly and are in the right position (e.g., swing doors, slide doors, etc.). Without a door schedule, correcting errors due to improper fit or lack of materials is time-consuming, confusing, and costly.

What to Include on a Door Schedule

Before you get started creating your door schedule, you’ll need to have the architectural drawing ready. Don’t have the drawings? Start at your front door and move left around the building, both inside and outside.

When creating your door schedule, itemize each door and accompanying hardware. You should include detailed information, such as the number of each hardware piece you will need. Your door schedule may include the following:

 

  • Door style
  • Door number (see drawings)
  • Door location on the building
  • Door height, width, and thickness
  • Material type
  • Colors and finishes
  • Door weight
  • Fire rating or not
  • Door hinges
  • Door locks and lock types (passage, privacy, )
  • Door push plates
  • Door vision panels or keyholes
  • Door stops
  • Door sliding tracks
  • Door pull handles
  • Door closers
  • Single or double door
  • Acoustics
  • Anything else not mentioned

Pricing is typically included on a door schedule for budgeting assessment purposes. However, when we provide a quote for your order, we’ll give you a total price that includes bulk discounts. This helps reduce costs!

Fill Your Door Schedule Order at a Discount

As a commercial door hardware provider, we are quite familiar with door schedules. Our team at Park Avenue Locks has been working with project managers and house flippers for years across the New York area. Though based in NY, our reach extends around the nation as we ship our high-quality commercial hardware right to your project site.

Upload your door schedule and receive a FREE quote on your order and take advantage of our bulk pricing today!